1000 HP Cyclic Spin Test Facility

About

The 1000 HP Cyclic Spin Test Facility is a high-performance, vertical-axis test rig designed for validating the centrifugal strength, burst speed, and fatigue life of high-speed rotors used in aerospace, automotive, energy, and defense applications. Engineered for up to 20,000 RPM with proof testing to 24,000 RPM, it features a robust 1000 HP AC motor, flexible-shaŌ coupling, and precision VFD speed control. A dedicated 650-liter SS-lined hydraulic lubrication system with multi-stage filtration ensures reliable operation of high-speed bearings under extreme loads. Integrated instrumentation—pressure transducers, tachometers, strain gauges, and PLC-based control panels—enables real-time monitoring and automated testing. The system is built with industry-leading safety features, including magnetic interlocks, polycarbonate guarding, and optional burst-containment enclosures compliant with CE, OSHA, and ANSI standards. Its modular skid-mounted layout ensures quick installation and easy maintenance. Widely used for fatigue life testing, empirical FEA validation, and qualification of mission-critical rotors, the facility combines mechanical precision, safety, and data-rich analysis to deliver unmatched reliability and repeatability in spin testing environments.
No Image

Image Gallery

Technical Details

            
Parameter Specification
Rated Power 1000 HP (design documentation)
Spin Speed Up to 20 000 RPM; proof tested to 24 000 RPM
Reservoir 650 L MS tank, SS 304 lining; 1600 × 1200 × 370 mm
Filler Breather 40 μm FSB-25
Level Indicators 2 × LG2-10 gauges; 4–20 mA transmitter (MASSIBUS 409-4INCNYNW0)
Suction Strainer 149 μm, 200 LPM (SC3-050)
Hydraulic Pump Dowty 115 cc/rev; 165 LPM; 3 bar; Servo System 32; Dowty 3P series
Primary/Secondary Filters 25 μm & 10 μm with clog indicators
Return Ports ¾ʺ BSPF (wall/drive bearings), 2ʺ BSPF (support bearings)
Relief & Drain Valves Inline relief @ 3 bar; ½ʺ BSPF drain, 25 bar WP
Pump Drive Motor 3.75 kW; 3Ø; 1440 RPM
Control Panel Electric hooter, limit switches, instrumentation panel
Footprint ≈ 4 m × 2 m × 3 m; 440 VAC, three-phase power; 5 bar air
Standards Compliance CE Machinery Directive; OSHA 1910.212; ANSI B11.5
    This spin test facility finds widespread use in sectors such as:
  • Aerospace: Testing turbine wheels, compressor discs, fan blades, and helicopter rotors to validate compliance with FAA/EASA fatigue requirements.
  • Automotive: Evaluating turbocharger rotors, cam phasers, and electric motor rotors under simulated engine acceleration conditions.
  • Energy Sector: Spin testing generator rotors, wind turbine hubs, and flywheels under simulated startup and shutdown transients.
  • Defense: Qualification of UAV rotors, high-speed projectile spin mechanisms, and missile turbopumps.

Key Features

  • 1000 HP Spin Capability: Continuous input power up to 1000 HP with overspeed proof testing to 24 000 RPM.
  • Precision Coupling: High-concentricity collet coupling for minimal run-out and resonance isolation.
  • Robust Hydraulic Circuit: 650 L SS-lined reservoir, Dowty 115 cc pump, multi-stage filtration and real-time level control.
  • Advanced Monitoring: Pressure gauges, clog-indicators, level transmiƩers and electric hooter ensure safe operation.
  • Integrated Control Panel: Ergonomic panel with limit switches, alarms and maintenance interlocks.
  • Modular Design: Skid-mounted assembly for rapid installation and straighƞorward servicing.
  • Compliance-Ready: Built to CE, OSHA and ANSI safety standards, with optional burst-containment chamber.

Media Gallery

Video Gallery

Download Gallery

×

Enquire Now

and we will get back to you.

  • United States+1
  • United Kingdom+44
  • Afghanistan (‫افغانستان‬‎)+93
  • Albania (Shqipëri)+355
  • Algeria (‫الجزائر‬‎)+213
  • American Samoa+1
  • Andorra+376
  • Angola+244
  • Anguilla+1
  • Antigua and Barbuda+1
  • Argentina+54
  • Armenia (Հայաստան)+374
  • Aruba+297
  • Australia+61
  • Austria (Österreich)+43
  • Azerbaijan (Azərbaycan)+994
  • Bahamas+1
  • Bahrain (‫البحرين‬‎)+973
  • Bangladesh (বাংলাদেশ)+880
  • Barbados+1
  • Belarus (Беларусь)+375
  • Belgium (België)+32
  • Belize+501
  • Benin (Bénin)+229
  • Bermuda+1
  • Bhutan (འབྲུག)+975
  • Bolivia+591
  • Bosnia and Herzegovina (Босна и Херцеговина)+387
  • Botswana+267
  • Brazil (Brasil)+55
  • British Indian Ocean Territory+246
  • British Virgin Islands+1
  • Brunei+673
  • Bulgaria (България)+359
  • Burkina Faso+226
  • Burundi (Uburundi)+257
  • Cambodia (កម្ពុជា)+855
  • Cameroon (Cameroun)+237
  • Canada+1
  • Cape Verde (Kabu Verdi)+238
  • Caribbean Netherlands+599
  • Cayman Islands+1
  • Central African Republic (République centrafricaine)+236
  • Chad (Tchad)+235
  • Chile+56
  • China (中国)+86
  • Christmas Island+61
  • Cocos (Keeling) Islands+61
  • Colombia+57
  • Comoros (‫جزر القمر‬‎)+269
  • Congo (DRC) (Jamhuri ya Kidemokrasia ya Kongo)+243
  • Congo (Republic) (Congo-Brazzaville)+242
  • Cook Islands+682
  • Costa Rica+506
  • Côte d’Ivoire+225
  • Croatia (Hrvatska)+385
  • Cuba+53
  • Curaçao+599
  • Cyprus (Κύπρος)+357
  • Czech Republic (Česká republika)+420
  • Denmark (Danmark)+45
  • Djibouti+253
  • Dominica+1
  • Dominican Republic (República Dominicana)+1
  • Ecuador+593
  • Egypt (‫مصر‬‎)+20
  • El Salvador+503
  • Equatorial Guinea (Guinea Ecuatorial)+240
  • Eritrea+291
  • Estonia (Eesti)+372
  • Ethiopia+251
  • Falkland Islands (Islas Malvinas)+500
  • Faroe Islands (Føroyar)+298
  • Fiji+679
  • Finland (Suomi)+358
  • France+33
  • French Guiana (Guyane française)+594
  • French Polynesia (Polynésie française)+689
  • Gabon+241
  • Gambia+220
  • Georgia (საქართველო)+995
  • Germany (Deutschland)+49
  • Ghana (Gaana)+233
  • Gibraltar+350
  • Greece (Ελλάδα)+30
  • Greenland (Kalaallit Nunaat)+299
  • Grenada+1
  • Guadeloupe+590
  • Guam+1
  • Guatemala+502
  • Guernsey+44
  • Guinea (Guinée)+224
  • Guinea-Bissau (Guiné Bissau)+245
  • Guyana+592
  • Haiti+509
  • Honduras+504
  • Hong Kong (香港)+852
  • Hungary (Magyarország)+36
  • Iceland (Ísland)+354
  • India (भारत)+91
  • Indonesia+62
  • Iran (‫ایران‬‎)+98
  • Iraq (‫العراق‬‎)+964
  • Ireland+353
  • Isle of Man+44
  • Israel (‫ישראל‬‎)+972
  • Italy (Italia)+39
  • Jamaica+1
  • Japan (日本)+81
  • Jersey+44
  • Jordan (‫الأردن‬‎)+962
  • Kazakhstan (Казахстан)+7
  • Kenya+254
  • Kiribati+686
  • Kosovo+383
  • Kuwait (‫الكويت‬‎)+965
  • Kyrgyzstan (Кыргызстан)+996
  • Laos (ລາວ)+856
  • Latvia (Latvija)+371
  • Lebanon (‫لبنان‬‎)+961
  • Lesotho+266
  • Liberia+231
  • Libya (‫ليبيا‬‎)+218
  • Liechtenstein+423
  • Lithuania (Lietuva)+370
  • Luxembourg+352
  • Macau (澳門)+853
  • Macedonia (FYROM) (Македонија)+389
  • Madagascar (Madagasikara)+261
  • Malawi+265
  • Malaysia+60
  • Maldives+960
  • Mali+223
  • Malta+356
  • Marshall Islands+692
  • Martinique+596
  • Mauritania (‫موريتانيا‬‎)+222
  • Mauritius (Moris)+230
  • Mayotte+262
  • Mexico (México)+52
  • Micronesia+691
  • Moldova (Republica Moldova)+373
  • Monaco+377
  • Mongolia (Монгол)+976
  • Montenegro (Crna Gora)+382
  • Montserrat+1
  • Morocco (‫المغرب‬‎)+212
  • Mozambique (Moçambique)+258
  • Myanmar (Burma) (မြန်မာ)+95
  • Namibia (Namibië)+264
  • Nauru+674
  • Nepal (नेपाल)+977
  • Netherlands (Nederland)+31
  • New Caledonia (Nouvelle-Calédonie)+687
  • New Zealand+64
  • Nicaragua+505
  • Niger (Nijar)+227
  • Nigeria+234
  • Niue+683
  • Norfolk Island+672
  • North Korea (조선 민주주의 인민 공화국)+850
  • Northern Mariana Islands+1
  • Norway (Norge)+47
  • Oman (‫عُمان‬‎)+968
  • Pakistan (‫پاکستان‬‎)+92
  • Palau+680
  • Palestine (‫فلسطين‬‎)+970
  • Panama (Panamá)+507
  • Papua New Guinea+675
  • Paraguay+595
  • Peru (Perú)+51
  • Philippines+63
  • Poland (Polska)+48
  • Portugal+351
  • Puerto Rico+1
  • Qatar (‫قطر‬‎)+974
  • Réunion (La Réunion)+262
  • Romania (România)+40
  • Russia (Россия)+7
  • Rwanda+250
  • Saint Barthélemy+590
  • Saint Helena+290
  • Saint Kitts and Nevis+1
  • Saint Lucia+1
  • Saint Martin (Saint-Martin (partie française))+590
  • Saint Pierre and Miquelon (Saint-Pierre-et-Miquelon)+508
  • Saint Vincent and the Grenadines+1
  • Samoa+685
  • San Marino+378
  • São Tomé and Príncipe (São Tomé e Príncipe)+239
  • Saudi Arabia (‫المملكة العربية السعودية‬‎)+966
  • Senegal (Sénégal)+221
  • Serbia (Србија)+381
  • Seychelles+248
  • Sierra Leone+232
  • Singapore+65
  • Sint Maarten+1
  • Slovakia (Slovensko)+421
  • Slovenia (Slovenija)+386
  • Solomon Islands+677
  • Somalia (Soomaaliya)+252
  • South Africa+27
  • South Korea (대한민국)+82
  • South Sudan (‫جنوب السودان‬‎)+211
  • Spain (España)+34
  • Sri Lanka (ශ්‍රී ලංකාව)+94
  • Sudan (‫السودان‬‎)+249
  • Suriname+597
  • Svalbard and Jan Mayen+47
  • Swaziland+268
  • Sweden (Sverige)+46
  • Switzerland (Schweiz)+41
  • Syria (‫سوريا‬‎)+963
  • Taiwan (台灣)+886
  • Tajikistan+992
  • Tanzania+255
  • Thailand (ไทย)+66
  • Timor-Leste+670
  • Togo+228
  • Tokelau+690
  • Tonga+676
  • Trinidad and Tobago+1
  • Tunisia (‫تونس‬‎)+216
  • Turkey (Türkiye)+90
  • Turkmenistan+993
  • Turks and Caicos Islands+1
  • Tuvalu+688
  • U.S. Virgin Islands+1
  • Uganda+256
  • Ukraine (Україна)+380
  • United Arab Emirates (‫الإمارات العربية المتحدة‬‎)+971
  • United Kingdom+44
  • United States+1
  • Uruguay+598
  • Uzbekistan (Oʻzbekiston)+998
  • Vanuatu+678
  • Vatican City (Città del Vaticano)+39
  • Venezuela+58
  • Vietnam (Việt Nam)+84
  • Wallis and Futuna (Wallis-et-Futuna)+681
  • Western Sahara (‫الصحراء الغربية‬‎)+212
  • Yemen (‫اليمن‬‎)+967
  • Zambia+260
  • Zimbabwe+263
  • Åland Islands+358

Details

Introduction

The 1000 HP Cyclic Spin Test Facility is an advanced testbed specifically engineered to simulate real-world centrifugal and vibrational forces experienced by high-speed rotating components in aerospace, automotive, and energy sectors. As rotor systems in turbines, compressors, and turbochargers are subjected to thousands of operational cycles, ensuring their integrity under maximum and fluctuating RPM becomes critical. This facility enables:
 - Cyclic fatigue testing to understand crack initiation and propagation behavior,
 - Burst-speed validation to confirm safe operational margins beyond design RPM,
 - Empirical stress-strain calibration for validating FEA simulations,
 - and quality assurance benchmarking to ensure compliance with industry standards such as
ISO 10494 (rotor dynamic testing) and ASME PTC 10 (compressors).

Its vertical flexible-shaŌ architecture emulates real loading profiles while allowing safe energy dissipation, making it ideal for endurance and destructive testing applications.

Mechanical Drive & Speed Control
The mechanical drive subsystem consists of:
 - A 746 kW (1000 HP) high-inertia AC induction motor capable of steady operation under extreme dynamic torque loads. It is controlled via an industrial-grade VFD (Variable Frequency Drive), which provides fine-grained speed control and adjustable acceleration
profiles.
 - A precision-ground flexible shaŌ and collet coupling, specifically chosen for its ability to isolate axial and lateral misalignments. This is critical for tests involving sudden load reversals, spin-up/spin-down thermal gradients, or component resonance studies.
 - Rotor balancing options are available to offset initial mass imbalances and avoid premature failure of the bearing assemblies or support housings.
 - Optional integration of torque sensors or telemetry rings can facilitate dynamic torque measurement during spin-up and stress transitions.

Lubrication & Filtration System 
The lubrication system plays a dual role—ensuring sustained operation of high-speed bearings and dissipating thermal loads. Its key capabilities include:
Tank Design & Cooling: The 650 L SS-lined tank ensures chemical compatibility and corrosion resistance with hydraulic oils like Servo System 32. The return flow is directed through optional heat exchangers or water-cooled chillers to maintain stable viscosity and reduce oxidation of oil.

Filter Logic: Multi-stage filtration helps meet NAS 1638 cleanliness levels required for aerospace-grade bearings. The primary and secondary filters protect high-value mechanical seals and journal/tilting pad bearings.

Diagnostics: Pressure differential indicators across filters, combined with SCADA integration, allow predictive maintenance and early fault detection.
Return Manifold Layout: The dual-size return ports (3⁄4഼ & 2഼ BSPF) help manage differential flow from various bearing types and test geometries. Such sizing prevents oil starvation and avoids cavitation risks under transient operation.

Instrumentation & Control Panel
Instrumentation ensures the safety, reliability, and repeatability of spin tests. The facility includes:
 - Redundant pressure sensing points at pump outlet and critical bearing return lines, offering both analog readouts and 4–20 mA digital output to PLCs.
 - High-speed optical tachometers and encoders used to log rotational velocity, with feedback loops to the VFD for closed-loop control.
 - Data Logging & Remote Access: Real-time logging enables ploƫng of RPM vs. time, vibration frequency analysis, and stress/strain maps. Data can be exported in CSV or binary formats for MATLAB, Python, or LabVIEW processing.
 - The control panel includes status indicators, alarms, emergency override functions, and MCBs for circuit-level protection. Wiring follows IEC 60204-1 standards.

Safety, Containment & Compliance
Spin testing can be inherently hazardous, especially during burst tests where fragments may be ejected at velocities > 300 m/s. This facility mitigates such risks via:
 - High-tensile steel containment enclosures optionally fiƩed with composite or aramid lining to absorb impact energy.
 - Polycarbonate viewing windows rated for ballistic resistance (oŌen UL 752 Level 1 or higher) offer visual inspection without compromising safety.
 - Magnetic door interlocks (e.g., KEYENCE GS or Pilz series) integrated with PLCs ensure tests cannot begin unless the enclosure is secured.
 - The system can be equipped with inert gas purging systems or fire suppression systems (e.g., FM-200 or Novec) in case of oil mist ignition during high-speed failures.
 - Compliance with ISO 12100 for risk assessment and ANSI/RIA TR R15.406 for safeguarding rotary test equipment ensures alignment with global safety norms.

Physical Layout & Maintenance
Engineered for industrial test labs and production floors, the rig features:
 - Skid-mounted modules for plug-and-play integration into test cells, simplifying relocation, leveling, and servicing.
 - Integrated drip trays and spill containment zones under the pump and reservoir modules, aligned with EPA and ISO 14001 environmental standards.
 - Maintenance-friendly layout with front-facing filter access, color-coded hydraulic lines, and ISO 1219-compliant schematics for rapid fault isolation.
 - Pre-lubrication purge and post-test oil cooling sequences can be automated for unmanned operation, especially in endurance test cycles exceeding 72 hours.

Applications & Benefits
This spin test facility finds widespread use in sectors such as:
 - Aerospace: Testing turbine wheels, compressor discs, fan blades, and helicopter rotors to validate compliance with FAA/EASA fatigue requirements.
 - Automotive: Evaluating turbocharger rotors, cam phasers, and electric motor rotors under simulated engine acceleration conditions.
 - Energy Sector: Spin testing generator rotors, wind turbine hubs, and flywheels under simulated startup and shutdown transients.
 - Defense: Qualification of UAV rotors, high-speed projectile spin mechanisms, and missile turbopumps.

Operational benefits include:
 - Reduction of warranty claims and field failures,
 - Calibration of simulation models (FEA/CFD) to physical reality,
 - Development of lightweight, high-speed rotating systems through safe design margins,
 - Enhanced traceability and certification via test documentation.

Key Features
 - 1000 HP Spin Capability: Continuous input power up to 1000 HP with overspeed proof testing to 24 000 RPM.
 - Precision Coupling: High-concentricity collet coupling for minimal run-out and resonance isolation.
 - Robust Hydraulic Circuit: 650 L SS-lined reservoir, Dowty 115 cc pump, multi-stage filtration and real-time level control.
 - Advanced Monitoring: Pressure gauges, clog-indicators, level transmiƩers and electric hooter ensure safe operation.
 - Integrated Control Panel: Ergonomic panel with limit switches, alarms and maintenance interlocks.
 - Modular Design: Skid-mounted assembly for rapid installation and straighƞorward servicing. 
 - Compliance-Ready: Built to CE, OSHA and ANSI safety standards, with optional burst-containment chamber.

Technical Specification
Parameter Specification
Rated Power 1000 HP (design documentation)
Spin Speed Up to 20 000 RPM; proof tested to 24 000 RPM
Reservoir 650 L MS tank, SS 304 lining; 1600 × 1200 × 370 mm
Filler Breather 40 μm FSB-25
Level Indicators 2 × LG2-10 gauges; 4–20 mA transmitter (MASSIBUS 409-4INCNYNW0)
Suction Strainer 149 μm, 200 LPM (SC3-050)
Hydraulic Pump Dowty 115 cc/rev; 165 LPM; 3 bar; Servo System 32; Dowty 3P series
Primary/Secondary Filters 25 μm & 10 μm with clog indicators
Return Ports ¾ʺ BSPF (wall/drive bearings), 2ʺ BSPF (support bearings)
Relief & Drain Valves Inline relief @ 3 bar; ½ʺ BSPF drain, 25 bar WP
Pump Drive Motor 3.75 kW; 3Ø; 1440 RPM
Control Panel Electric hooter, limit switches, instrumentation panel
Footprint ≈ 4 m × 2 m × 3 m; 440 VAC, three-phase power; 5 bar air
Standards Compliance CE Machinery Directive; OSHA 1910.212; ANSI B11.5

Trending Products

Share This Page